Fred’s Racing

Fred Falkner started his business adventure in 1984 at a small shop in Lasalle, Ontario. Fred’s small fabrication shop specialized in metal fabrication for the race car industry, where he built many successful cars to race at the local Checker Flag track, as well as across Canada.

Becoming FCF Custom Fab Inc.

In 1985, the business was relocated to Outer Drive in Oldcastle, ON where FCF Custom Fab was born. With Fred’s experience and knowledge, FCF expanded into the design and manufacturing of paint racks and part storage containers for Tier 1 automotive part suppliers.

The Beginning of a New Success

Advances in technology lead to the purchase of FCF’s first Flow waterjet cutting machine. This machine would soon become a huge success for the company, with it’s ability to cut almost any material up to 8″ thick.

Two Fully Owned Facilities

With the growing success of their first waterjet, FCF purchased a second Flow waterjet in addition to constructing a new 12,800 square foot building to house their new cutting department. Now operating from 2 fully owned facilities, the original 8,800 square foot building would be home to prototyping, fabrication, thermal cleaning and repair departments.

Trumpf TruLaser 1030

Propelled by their willingness to deliver high-quality cuts at more affordable costs, FCF invested in their first laser the Trumpf TruLaser 1030.

The cutting department’s continued success encouraged the purchase of a third Flow waterjet.

laser, laser cutting

The TruLaser 1030 has the capability to cut 5’ X 10’ sheets of mild steel, stainless steel, and aluminum to a maximum thickness of:

  • Mild Steel – 1/2”
  • Stainless Steel – 3/16”
  • Aluminum – 3/16”

Another Lucrative Investment

With the cutting department thriving, a fourth Flow waterjet was purchased. This investment allowed us to keep up with our customers’ demands while still meeting our quick turnaround times.

Meet Our Team

We love what we do and we do it with passion

Fred Falkner

President

Lisa Hunter

Fabrication Project Coordinator

Cody Falkner

Vice President of Operations

Mike Heidt

Quoting & Cutting Manager

Deborah Falkner

Office Administrator

Cerka Hadzalic

Administrative Assistant

Rebecca Rocheleau

Administrative Assistant